Details

  • Client Westgold
  • Sector Mine Site
  • Location Meekatharra, Western Australia
  • Services Heavy Duty Structural Demolition
  • Status Completed 2026

Overview

Focus Demolition was engaged by Westgold to develop a demolition methodology and undertake the demolition of a 24-metre-high concrete fine ore bin structure within an operational mining environment. The project involved the controlled demolition of both the elevated steel roof structure and reinforced concrete bin using high-reach demolition equipment.

The works presented a number of key challenges, including the demolition of a high concrete structure within a live mining environment, the safe management of elevated demolition activities, controlled demolition sequencing of steel and reinforced concrete elements, and the requirement to complete works efficiently within operational constraints.

A staged demolition methodology was developed to safely dismantle the structure from the top down using specialised high-reach demolition equipment. Key elements included:

  • Use of a 62-tonne high-reach excavator fitted with demolition attachments
  • Demolition of the steel roof structure using a hydraulic steel shear
  • Progressive demolition of reinforced concrete walls down to ground level using pulveriser and shear attachments
  • Demolition and removal of concrete footings using hydraulic rock breaker attachments
  • Processing and segregation of demolition materials for removal and recycling where applicable

The methodology allowed controlled demolition while maintaining safe exclusion zones and minimising operational impacts.

Results

  • Safe completion of all works with zero incidents
  • Demolition completed ahead of program
  • Successful removal of elevated steel and reinforced concrete structures
  • Efficient delivery within client operational requirements
Share